Commencement of Ducting

Work has started on the undergrounding of the ducting, which will containing the cables for connecting Gweedore Windfarm to the ESB electricity network. The landowners along the public road are aware of this work and Gweedore windfarm has consulted with them and apologises for any inconvenience temporary caused. The work Read more…

Site Layout

The 5 new turbines will be located in a semi circle below the existing windfarm; The set back distance between the nearest turbine and the nearest dwelling is 1.2km and the windfarm will operate well within permitted noise levels. The existing windfarm access road will be used for access to Read more…